If you decide to carry out major repairsapartments, then it is necessary to start it with the arrangement of the floors. If you need to lay a new floor covering, then before that you must make a screed. However, this work should be prepared. That is, waterproofing must be carried out before the floor screed in the apartment. How and what to do, you will learn further.
The process should be producedcertainly. Such protection will ensure a continued and effective use of the premises. That is, if you have problems with the water pipe or the faucet and the water flows directly to the floors, you will have the opportunity to avoid conflicts with neighbors that you will flood. Without insulation, the fluid will leak even through the most durable layer of concrete.
Take into account that the waterproofing before the floor screed inapartment should be carried out in all rooms, not only in the kitchen and bathroom. The fact is that in a concrete solution, which you will level the surface, too, contains a large amount of moisture. If the liquid will evaporate gradually, which provides waterproofing, the screed will be more durable and of high quality.
Thanks to this procedure, you will be able to protect the room from excess moisture, spreading fungus and mold.
Waterproofing before the floor screed in the apartment has certain nuances:
Before the waterproofing is carried out before the floor screed in the apartment, you need to understand what it is worth applying. There are such types of materials:
1. Roll. Most often in this case, ruberoid or fiberglass is used.
2. The membrane. Most often this material is polyethylene. It has a low cost, but it can not be called strong, as it quickly breaks.
3. Liquid bitumen solution with additives. It has a fairly high cost, but it is very simple to install. In this case, after drying, it forms a very strong layer, which does not allow liquid to pass through.
4. Stucco. Such mixtures consist of cement and various kinds of additives. Naturally, such a substance will need to be diluted with water and applied with a spatula.
In addition, the floor waterproofing in the apartment before the screed can be applied in such ways:
Now we need to understand what needs to be done before implementing such a hydroprotection. Preparatory work will include the following actions:
So, let's see in more detail in the implementationprocedures. Waterproofing the floor in the apartment before the screed (materials that are used in the work, you already know) should be done in stages. If you decide to use roll materials, then the procedure for laying them has the following features:
1. First you need to spread the coating on the floor. For maximum protection it is better to use a couple of layers. Note that at the junction of the horizontal and vertical planes, the web should go to the wall for another 15 cm from the floor.
2. Please note that this protection must be continuous. If you have to use several pieces of material, then it must be overlapped, and it should be 20-30 cm.
3. In the corners, the product must be folded neatly.
4. In order for such patronage to be effective, the joints between the layers of material should be smeared with bituminous mastic.
If more serious protection is required, it is betterapply the mastic. In this case, the stage with the leveling of the surface can be safely skipped. You will not need any special equipment or additional tools. Waterproofing the floor in the apartment before the screed (photo of the process you can see in the article), thus, involves the use of dry substances, for the preparation of which requires water. In addition, it is possible to use ready-made liquid formulations.
Naturally, before you start working, you need the floorthoroughly clean and cover with a coat of primer. Further, a special tape needs to glue the corners and joints, where the probability of moisture percolation is highest. Next, you should prepare a solution.
Apply very carefully to the floor and walls,in the case of the latter - to a height of about 35 cm. For this, either a roller or a brush is used. Strongly rub in the floor or smear the composition is not necessary. After grasping the first layer, it should be moistened and a second one applied. And they must fit perpendicular to each other. It is enough to apply only three layers.
In the event that the mud floor waterproofing in the apartment before the screed ("Hydroisol", for example) will be successful, you can pour it with prepared concrete.
As you can see, the floor waterproofing in the apartment in front oftie with their own hands is simple enough. You just need to get used to it. Many readers are interested in how to make a hydroprotection with a wet concrete screed. It's very simple.
1. Clean the surface, and then apply a primer solution to it.
2. After it dries up, it is necessary to detect and repair all the cracks and holes in the sand-cement mix.
3. Now you can proceed to cement waterproofing. Using a trowel, apply it to the floor. Observe the same layer thickness throughout the area. After it dries, apply at least 3 layers of mastic. To fully dry such a waterproof you will need at least 6 hours.
Note that this method can only be suitable for rooms that differ in normal or low humidity.
Regardless of which material for the job you choose, each process has its own subtleties, which should be taken into account:
As you saw, the waterproofing of the floor before the screed(materials also had time to consider) is carried out quite quickly and simply. You can manage this task without recruiting specialists.